Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/greeaihh/ea.greenpeg.com/wp-includes/functions.php on line 6121
PCS 7 Control System Upgrade – Greenpeg East Africa

Projects

Completed
PCS 7 Control System Upgrade
August 2022
Dangote Cement
4 Months

In this critical infrastructure upgrade, we modernized the existing Siemens PCS7 control system from version 7 to version 9. This significant update enhanced the cement plant’s automation capabilities, improving operational efficiency, data management, and overall plant performance. Our expertise in handling complex control system migrations ensured a smooth transition with minimal disruption to ongoing operations.

Operations Performed

  • Replacement and upgrade of VFDs, including design, build, parameterisation, and commissioning.